21 CFR Part 111: what FDA cites most
21 CFR Part 111 is FDA’s current good manufacturing practice (cGMP) rule for dietary supplements. The section FDA cites most is 111.70 (What specifications must you establish?), on the Form 483s of 1,982 of 4,292 inspections with posted Part 111 citations.
Part 111 applies to anyone who manufactures, packages, labels or holds a dietary supplement, including brands that hire a contract manufacturer. It covers personnel, the physical plant, equipment, a production and process control system, specifications and testing (sections 111.70 and 111.75), quality control, batch records, laboratory operations, complaints, returns and records. The counts below come from 4,292 FDA inspections with Part 111 observations posted on the FDA Data Dashboard and 373 warning letters that cite Part 111.
Every Part 111 section FDA has cited
| Section | What the section covers (eCFR heading) | Inspections citing it on a 483 | Firms | Warning letters citing it |
|---|---|---|---|---|
| 111.70 | What specifications must you establish? (Requirement to Establish a Production and Process Control System) | 1,982 | 1,359 | 295 |
| 111.75 | What must you do to determine whether specifications are met? (Requirement to Establish a Production and Process Control System) | 1,776 | 1,160 | 247 |
| 111.205 | What is the requirement to establish a master manufacturing record? (Production and Process Control System: Requirements for the Master Manufacturing Record) | 1,160 | 885 | 168 |
| 111.255 | What is the requirement to establish a batch production record? (Production and Process Control System: Requirements for the Batch Production Record) | 988 | 705 | 177 |
| 111.103 | What are the requirements under this subpart F for written procedures? (Production and Process Control System: Requirements for Quality Control) | 899 | 724 | 168 |
| 111.260 | What must the batch record include? (Production and Process Control System: Requirements for the Batch Production Record) | 743 | 606 | 178 |
| 111.210 | What must the master manufacturing record include? (Production and Process Control System: Requirements for the Master Manufacturing Record) | 632 | 504 | 145 |
| 111.553 | What are the requirements under this subpart O for written procedures? (Product Complaints) | 612 | 537 | 104 |
| 111.453 | What are the requirements under this subpart for M written procedures? (Holding and Distributing) | 564 | 508 | 80 |
| 111.105 | What must quality control personnel do? (Production and Process Control System: Requirements for Quality Control) | 531 | 423 | 102 |
| 111.503 | What are the requirements under this subpart N for written procedures? (Returned Dietary Supplements) | 500 | 462 | 77 |
| 111.83 | What are the requirements for reserve samples? (Requirement to Establish a Production and Process Control System) | 449 | 401 | 68 |
| 111.27 | What requirements apply to the equipment and utensils that you use? (Equipment and Utensils) | 383 | 320 | 47 |
| 111.15 | What sanitation requirements apply to your physical plant and grounds? (Physical Plant and Grounds) | 383 | 319 | 29 |
| 111.570 | Under this subpart O, what records must you make and keep? (Product Complaints) | 370 | 323 | 69 |
| 111.475 | Under this subpart M, what records must you make and keep? (Holding and Distributing) | 364 | 333 | 33 |
| 111.123 | What quality control operations are required for the master manufacturing record, the batch production record, and manufacturing operations? (Production and Process Control System: Requirements for Quality Control) | 356 | 290 | 48 |
| 111.535 | Under this subpart N, what records must you make and keep? (Returned Dietary Supplements) | 315 | 283 | 44 |
| 111.25 | What are the requirements under this subpart D for written procedures? (Equipment and Utensils) | 302 | 259 | 40 |
| 111.12 | What personnel qualification requirements apply? (Personnel) | 301 | 257 | 40 |
| 111.113 | What quality control operations are required for a material review and disposition decision? (Production and Process Control System: Requirements for Quality Control) | 287 | 243 | 42 |
| 111.35 | Under this subpart D, what records must you make and keep? (Equipment and Utensils) | 232 | 211 | 43 |
| 111.140 | Under this subpart F, what records must you make and keep? (Production and Process Control System: Requirements for Quality Control) | 230 | 205 | 100 |
| 111.365 | What precautions must you take to prevent contamination? (Production and Process Control System: Requirements for Manufacturing Operations) | 227 | 197 | 21 |
| 111.20 | What design and construction requirements apply to your physical plant? (Physical Plant and Grounds) | 221 | 191 | 6 |
| 111.65 | What are the requirements for quality control operations? (Requirement to Establish a Production and Process Control System) | 219 | 183 | 53 |
| 111.14 | Under this subpart B, what records must you make and keep? (Personnel) | 204 | 185 | 28 |
| 111.16 | What are the requirements under this subpart C for written procedures? (Physical Plant and Grounds) | 203 | 190 | 14 |
| 111.155 | What requirements apply to components of dietary supplements? (Production and Process Control System: Requirements for Components, Packaging, and Labels and for Product That You Receive for Packaging or Labeling as a Dietary Supplement) | 194 | 170 | 24 |
| 111.403 | What are the requirements under this subpart L for written procedures? (Production and Process Control System: Requirements for Packaging and Labeling Operations) | 183 | 161 | 44 |
| 111.55 | What are the requirements to implement a production and process control system? (Requirement to Establish a Production and Process Control System) | 180 | 149 | 61 |
| 111.560 | What requirements apply to the review and investigation of a product complaint? (Product Complaints) | 179 | 149 | 79 |
| 111.455 | What requirements apply to holding components, dietary supplements, packaging, and labels? (Holding and Distributing) | 179 | 154 | 33 |
| 111.320 | What requirements apply to laboratory methods for testing and examination? (Production and Process Control System: Requirements for Laboratory Operations) | 175 | 157 | 10 |
| 111.315 | What are the requirements for laboratory control processes? (Production and Process Control System: Requirements for Laboratory Operations) | 174 | 152 | 19 |
| 111.180 | Under this subpart G, what records must you make and keep? (Production and Process Control System: Requirements for Components, Packaging, and Labels and for Product That You Receive for Packaging or Labeling as a Dietary Supplement) | 160 | 142 | 15 |
| 111.73 | What is your responsibility for determining whether established specifications are met? (Requirement to Establish a Production and Process Control System) | 152 | 124 | 92 |
| 111.30 | What requirements apply to automated, mechanical, or electronic equipment? (Equipment and Utensils) | 149 | 126 | 8 |
| 111.10 | What requirements apply for preventing microbial contamination from sick or infected personnel and for hygienic practices? (Personnel) | 146 | 137 | 6 |
| 111.430 | Under this subpart L, what records must you make and keep? (Production and Process Control System: Requirements for Packaging and Labeling Operations) | 145 | 124 | 25 |
| 111.415 | What requirements apply to filling, assembling, packaging, labeling, and related operations? (Production and Process Control System: Requirements for Packaging and Labeling Operations) | 139 | 122 | 21 |
| 111.410 | What requirements apply to packaging and labels? (Production and Process Control System: Requirements for Packaging and Labeling Operations) | 131 | 120 | 27 |
| 111.153 | What are the requirements under this subpart G for written procedures? (Production and Process Control System: Requirements for Components, Packaging, and Labels and for Product That You Receive for Packaging or Labeling as a Dietary Supplement) | 131 | 122 | 19 |
| 111.120 | What quality control operations are required for components, packaging, and labels before use in the manufacture of a dietary supplement? (Production and Process Control System: Requirements for Quality Control) | 125 | 109 | 26 |
| 111.77 | What must you do if established specifications are not met? (Requirement to Establish a Production and Process Control System) | 116 | 102 | 25 |
| 111.95 | Under this subpart E, what records must you make and keep? (Requirement to Establish a Production and Process Control System) | 108 | 97 | 91 |
| 111.127 | What quality control operations are required for packaging and labeling operations? (Production and Process Control System: Requirements for Quality Control) | 104 | 93 | 66 |
| 111.353 | What are the requirements under this subpart K for written procedures? (Production and Process Control System: Requirements for Manufacturing Operations) | 103 | 97 | 14 |
| 111.160 | What requirements apply to packaging and labels received? (Production and Process Control System: Requirements for Components, Packaging, and Labels and for Product That You Receive for Packaging or Labeling as a Dietary Supplement) | 99 | 91 | 15 |
| 111.303 | What are the requirements under this subpart J for written procedures? (Production and Process Control System: Requirements for Laboratory Operations) | 99 | 88 | 14 |
| 111.165 | What requirements apply to a product received for packaging or labeling as a dietary supplement (and for distribution rather than for return to the supplier)? (Production and Process Control System: Requirements for Components, Packaging, and Labels and for Product That You Receive for Packaging or Labeling as a Dietary Supplement) | 96 | 85 | 10 |
| 111.80 | What representative samples must you collect? (Requirement to Establish a Production and Process Control System) | 94 | 84 | 16 |
| 111.8 | What are the requirements under this subpart B for written procedures? (Personnel) | 92 | 87 | 7 |
| 111.610 | What records must be made available to FDA? (Records and Recordkeeping) | 87 | 75 | 7 |
| 111.465 | What requirements apply to holding reserve samples of dietary supplements? (Holding and Distributing) | 77 | 74 | 18 |
| 111.325 | Under this subpart J, what records must you make and keep? (Production and Process Control System: Requirements for Laboratory Operations) | 76 | 66 | 10 |
| 111.23 | Under this subpart C, what records must you make and keep? (Physical Plant and Grounds) | 70 | 67 | 16 |
| 111.110 | What quality control operations are required for laboratory operations associated with the production and process control system? (Production and Process Control System: Requirements for Quality Control) | 61 | 58 | 11 |
| 111.135 | What quality control operations are required for product complaints? (Production and Process Control System: Requirements for Quality Control) | 51 | 50 | 5 |
| 111.605 | What requirements apply to the records that you make and keep? (Records and Recordkeeping) | 49 | 45 | 9 |
| 111.360 | What are the requirements for sanitation? (Production and Process Control System: Requirements for Manufacturing Operations) | 48 | 44 | 7 |
| 111.130 | What quality control operations are required for returned dietary supplements? (Production and Process Control System: Requirements for Quality Control) | 43 | 41 | 6 |
| 111.375 | Under this subpart K, what records must you make and keep? (Production and Process Control System: Requirements for Manufacturing Operations) | 42 | 41 | 13 |
| 111.117 | What quality control operations are required for equipment, instruments, and controls? (Production and Process Control System: Requirements for Quality Control) | 40 | 39 | 4 |
| 111.510 | What requirements apply when a returned dietary supplement is received? (Returned Dietary Supplements) | 35 | 34 | 20 |
| 111.60 | What are the design requirements for the production and process control system? (Requirement to Establish a Production and Process Control System) | 29 | 27 | 1 |
| 111.90 | What requirements apply to treatments, in-process adjustments, and reprocessing when there is a deviation or unanticipated occurrence or when a specification established in accordance with § 111.70 is not met? (Requirement to Establish a Production and Process Control System) | 22 | 21 | 1 |
| 111.460 | What requirements apply to holding in-process material? (Holding and Distributing) | 20 | 19 | 3 |
| 111.420 | What requirements apply to repackaging and relabeling? (Production and Process Control System: Requirements for Packaging and Labeling Operations) | 15 | 15 | 4 |
| 111.87 | Who conducts a material review and makes a disposition decision? (Requirement to Establish a Production and Process Control System) | 14 | 14 | 0 |
| 111.13 | What supervisor requirements apply? (Personnel) | 13 | 13 | 1 |
| 111.370 | What requirements apply to rejected dietary supplements? (Production and Process Control System: Requirements for Manufacturing Operations) | 12 | 11 | 6 |
| 111.530 | When must an investigation be conducted of your manufacturing processes and other batches? (Returned Dietary Supplements) | 9 | 9 | 6 |
| 111.170 | What requirements apply to rejected components, packaging, and labels, and to rejected products that are received for packaging or labeling as a dietary supplement? (Production and Process Control System: Requirements for Components, Packaging, and Labels and for Product That You Receive for Packaging or Labeling as a Dietary Supplement) | 8 | 8 | 1 |
| 111.310 | What are the requirements for the laboratory facilities that you use? (Production and Process Control System: Requirements for Laboratory Operations) | 8 | 8 | 1 |
| 111.355 | What are the design requirements for manufacturing operations? (Production and Process Control System: Requirements for Manufacturing Operations) | 7 | 6 | 5 |
| 111.470 | What requirements apply to distributing dietary supplements? (Holding and Distributing) | 7 | 7 | 4 |
| 111.525 | What requirements apply to a returned dietary supplement that quality control personnel approve for reprocessing? (Returned Dietary Supplements) | 6 | 6 | 1 |
| 111.515 | When must a returned dietary supplement be destroyed, or otherwise suitably disposed of? (Returned Dietary Supplements) | 5 | 5 | 13 |
| 111.425 | What requirements apply to a packaged and labeled dietary supplement that is rejected for distribution? (Production and Process Control System: Requirements for Packaging and Labeling Operations) | 4 | 4 | 1 |
| 111.520 | When may a returned dietary supplement be salvaged? (Returned Dietary Supplements) | 3 | 3 | 11 |
| 111.3 | What definitions apply to this part? (General Provisions) | 0 | 0 | 4 |
| 111.36 | 0 | 0 | 3 | |
| 111.7 | 0 | 0 | 2 | |
| 111.2600 | 0 | 0 | 2 | |
| 111.533 | 0 | 0 | 1 | |
| 111.51 | 0 | 0 | 1 | |
| 111.115 | 0 | 0 | 1 | |
| 111.5301 | 0 | 0 | 1 | |
| 111.555 | 0 | 0 | 1 | |
| 111.53 | 0 | 0 | 1 | |
| 111.1 | Who is subject to this part? (General Provisions) | 0 | 0 | 1 |
An inspection counts once per section even when the 483 cites several paragraphs of it. Warning letter counts come from the section numbers each letter names, in letters posted since 2021 and letters issued 2009 to 2020. Each section links to its own page with counts by year and the companies cited.
Common questions
What is 21 CFR Part 111?
It is the federal regulation that sets current good manufacturing practice for manufacturing, packaging, labeling and holding dietary supplements. It took effect in stages from 2008 to 2010.
What do 21 CFR 111.70 and 111.75 require?
Section 111.70 requires a firm to set specifications, for example for the identity, purity, strength and composition of components and finished batches. Section 111.75 requires the firm to determine whether those specifications are met, including identity testing of dietary ingredients.
Does Part 111 apply to a brand that uses a contract manufacturer?
Yes. 2 of the warning letters in this index state, citing the 2007 Part 111 rule (72 Fed. Reg. 34752), that a firm may contract out manufacturing operations but cannot contract out its ultimate responsibility for the supplement it places on the market.
This page lists public regulatory records as published by the issuing agency. A record is not a finding by this site. A warning letter states the agency’s view at the time it was issued; companies may have responded or corrected the issue since. Follow each link for the original document and any close-out letter. Report an error or add a company response.
Sources
- eCFR: 21 CFR Part 111
- FDA Data Dashboard: inspections, citations and published 483s
- FDA warning letters
Records last pulled Nov 22, 2026. Every entry links to the original public record.